Iteration #6

Here’s how we did in iteration #5:

  • Finish local search deployment – DEPLOYED
  • Channels phase 1 – client/hub integration – DEV DONE
  • Channels phase 1 – feeds – DEV DONE
  • Channels phase 1 – views – DEV DONE
  • Channels phase 1 – extend taxonomy support – DEV DONE
  • Profile tools phase 2 – DEPLOYED
  • More Plank updates – DEPLOYED
  • E-Calendar summer studies import – NOT DONE
  • Complete private files module (make it work with all files) – DEV DONE
  • Improve menu control – DONE
  • Deploy megamenu NOT DONE
  • Slideshow fixes – DEPLOYED
  • Deploy view_unpublished_content – DEPLOYED
  • Prettify gallery display – DONE
  • Some plugin and module updates – DONE
  • Deploy feedback form and spam protection – NOT DONE
  • Other miscellaneous tickets – DONE

We closed 48 tickets in iteration 5, for a total of 159 story points.

Here’s what we are doing in iteration 6:

  • Prepare directory module for deployment
  • Fixes to maps
  • Fixes to HR job postings
  • Fixes to breadcrumb handling
  • Deployment of mega-menu
  • Deployment of new file management interface
  • Deployment of localization server
  • E-Calendar Summer Studies import
  • E-Calendar enhancements
  • Channels testing
  • Channels UI enhancements
  • Channels block management enhancements
  • Channels client/hub enhancements
  • Module updates
  • Homepage updates
  • Improved taxonomy pages
  • Weather widget for Gault estate
  • Code reviews for ISR, Libraries and Koumbit

I6 contains 49 tickets, worth a total of 168.5 story points.

Comments are closed.

Blog authors are solely responsible for the content of the blogs listed in the directory. Neither the content of these blogs, nor the links to other web sites, are screened, approved, reviewed or endorsed by McGill University. The text and other material on these blogs are the opinion of the specific author and are not statements of advice, opinion, or information of McGill.